Does this sound familiar?
Most growing businesses have no one whose job is the supply chain. Stock, purchasing and freight get managed by habit, and the cost builds quietly.
- Shelves are full, but you still run outToo much of what sells slowly, too little of what sells fast.
- You reorder by feelQuantities and timings were set years ago and nobody has checked them since.
- Freight costs are a mysteryInvoices get paid, but no one compares them with the quotes or the alternatives.
Three fixed-price diagnostics
Each one is a defined project with a written report and a walkthrough call. You know the price before we start.
Inventory and material flow diagnostic
What to hold, when to reorder, and how much cash you can release.
What is includedFreight cost audit
What you are paying against what you should be paying.
What is includedSupplier and spend review
Where the savings are and how to get them.
What is includedWe also help with demand forecasting, warehouse layout, supply chain risk, tenders, KPI dashboards and freight carbon estimates. See all services
- 3
- Core Diagnostics
- £1,500
- Starting Price
- 24h
- Proposal Turnaround
- 3 wks
- Longest Wait for a Report
- £0
- First Review
How it works
The work is done remotely from your own data, so it fits around a busy operation.
- Free 30-minute callWe talk through your operation and agree which diagnostic fits.
- Proposal within 24 hoursOne page: scope, price, and the data we need.
- You send the dataUsually exports from your stock, purchasing or accounts system, after a confidentiality agreement is signed.
- Report in 2 to 3 weeksFindings, numbers and a prioritised action list, followed by a walkthrough call.
Calls are available at lunchtime and after 5pm on weekdays. We reply to messages within 24 hours.
From the blog
Short, practical guides to the methods behind our diagnostics.
ABC analysis: find the stock lines that matter
How to rank your range by value so effort goes where the money is.
Reorder points and safety stock in plain English
Two numbers that stop both stockouts and overbuying.
LCL or FCL? Finding your break-even volume
When a full container becomes cheaper than paying by the cubic metre.
Supply chain notes by email
An occasional email with a practical guide on stock, suppliers or freight. No sales sequences.
Ready to see where your cash is tied up?
Tell us a little about your business and what is bothering you about stock, suppliers or freight. There is no obligation.
Home / Services
Services
Three core diagnostics and six further services. Each one is a defined project with a written report and a walkthrough call. You know the price before we start.
Inventory and material flow diagnostic
What to hold, when to reorder, and how much cash you can release.
- ABC analysis of your range
- Reorder points and safety stock
- Excess and slow-moving stock, valued
- A prioritised action list
Freight cost audit
What you are paying against what you should be paying.
- Carrier rates and invoices checked against quotes
- LCL versus FCL break-even for import lanes
- Pallet and load improvements
- A savings estimate
Supplier and spend review
Where the savings are and how to get them.
- Spend by supplier and category
- A weighted supplier scorecard
- A savings shortlist
- A ready-to-send quote request
Further services
The same way of working applied to other parts of your supply chain: your data, a defined scope, a written report and a walkthrough call.
Demand forecasting and planning
A forecast you can buy and build against.
- Forecast by line from your sales history
- Seasonality and trend identified
- Forecast accuracy measured
- A simple monthly planning routine
Warehouse layout and slotting review
Less walking, faster picking, better use of space.
- Pick frequency analysis by line
- Slotting plan based on ABC ranking
- Space use and congestion points
- A phased move plan
Supply chain risk assessment
Know where one failure would stop you trading.
- Single-source and long lead time items mapped
- Risks scored by likelihood and impact
- A risk register you can maintain
- Practical mitigation actions
Tender and quote support
Run a fair, structured comparison when you go to market.
- A clear specification and quote request pack
- Weighted evaluation criteria
- Like-for-like bid comparison
- A recommendation with the reasoning
Supply chain KPI dashboard
The handful of numbers that tell you if things are working.
- Stock turn and stock cover
- Service level and stockouts
- Supplier on-time, in-full delivery
- Built in Excel from your own exports
Freight carbon footprint estimate
A first measure of the emissions in your freight.
- Emissions by lane and transport mode
- Calculated with UK government conversion factors
- Your highest-emitting flows identified
- Options to reduce them
What every project includes
A written report
Findings, numbers and a prioritised action list you can act on without us.
A walkthrough call
We take you through the report and answer questions from your team.
A fixed price
Scope and price are agreed in a one-page proposal before any work starts.
Confidentiality
A confidentiality agreement is signed before you send any data. The work is done remotely.
What you get
- ABC analysis of your range. Every line ranked by value, so you know which few lines carry most of the money.
- Reorder points and safety stock. Calculated per line from your demand and lead times.
- Excess and slow-moving stock, valued. How much cash is sitting in stock you do not need, and where.
- A prioritised action list. What to reorder first, what to run down and what to stop buying.
What we need from you
Usually three exports from your stock or accounts system: current stock by line, 12 months of sales or usage, and supplier lead times. Spreadsheets are fine.
Timescale
A written report in 2 to 3 weeks from receiving your data, followed by a walkthrough call.
See the output first
The sample report shows the format and depth of this diagnostic, using an invented company.
View the sample reportIs this the right one?
A free 30-minute call is enough to tell. If another diagnostic fits better, we will say so.
Book a free reviewWhat you get
- Carrier rates and invoices checked against quotes. Line by line, so overcharges and creeping surcharges are visible.
- LCL versus FCL break-even for import lanes. The shipment size at which a full container becomes cheaper for each lane.
- Pallet and load improvements. Where better pallet builds or load plans cut the cost per unit moved.
- A savings estimate. What the changes are worth across a year of shipments.
What we need from you
Recent freight invoices, the quotes or rate cards they relate to, and shipment details such as volume, weight and lane.
Timescale
A written report in 2 to 3 weeks from receiving your data, followed by a walkthrough call.
Talk it through
Bring a recent freight invoice to a free 30-minute call and we will tell you what an audit would look at.
Book a free reviewWhat you get
- Spend by supplier and category. A clear picture of where the money goes and how concentrated it is.
- A weighted supplier scorecard. Suppliers scored on the criteria that matter to your business, such as price, delivery and quality.
- A savings shortlist. The categories and suppliers where a better deal is most likely.
- A ready-to-send quote request. A document you can issue to suppliers straight away.
What we need from you
12 months of purchase data from your purchasing or accounts system: supplier, item or category, quantity and value.
Timescale
A written report in 2 to 3 weeks from receiving your data, followed by a walkthrough call.
Estimate the value
Put your own purchase spend into the savings calculator to see what a small percentage is worth.
Open the calculatorStart with a conversation
Tell us which suppliers or categories concern you most. The first call is free.
Book a free reviewHome / Industries / Manufacturers
Supply chain diagnostics for small manufacturers
Keep production supplied without filling the stores with material you will not use this quarter.
Where the cost usually hides
- Shortages that stop the lineOne missing component holds up a whole order while other materials sit untouched.
- Order quantities nobody has reviewedMinimums and reorder levels set years ago no longer match what production uses.
- Inbound freight paid without checkingImport and delivery charges are approved because the material is needed, not because the price is right.
Which diagnostic fits
Inventory and material flow
For raw materials and components: what to hold, when to reorder and what is excess.
DetailsSupplier and spend review
For purchased parts and materials: where spend is concentrated and where to ask for quotes.
DetailsFreight cost audit
For imported materials: whether you are shipping the right way at the right rate.
DetailsHome / Industries / Distributors
Supply chain diagnostics for distributors
Hold the right range in the right quantities, and know your true cost of getting it here.
Where the cost usually hides
- Slow lines soaking up cashA long tail of products that rarely sell but still take space and money.
- Fast lines running outYour best sellers go out of stock because they are reordered the same way as everything else.
- Landed cost nobody has added upFreight, handling and surcharges change the real margin on imported lines.
Which diagnostic fits
Inventory and material flow
For your product range: ABC ranking, reorder points and a valued list of excess stock.
DetailsFreight cost audit
For import lanes and outbound deliveries: invoices against quotes, and LCL against FCL.
DetailsSupplier and spend review
For your supplier base: who you depend on, how they perform and where to renegotiate.
DetailsHome / Resources / Savings calculator
Savings calculator
A rough estimate of what a diagnostic could be worth to your business, built from your own figures and assumptions.
The starting numbers below are example inputs, not benchmarks. Replace them with your own. Nothing you type leaves your browser.
Your estimate
- Cash released from stock (one-off)
- £0
- Holding cost saved each year
- £0
- Freight saved each year
- £0
- Purchasing saved each year
- £0
- Total saved each year
- £0
This is arithmetic on your assumptions, not a forecast or a guarantee. A diagnostic replaces the assumptions with figures from your own data.
Home / Resources / Blog
Blog
Short, practical guides to the methods behind our diagnostics. Each one is something you can try on your own data.
ABC analysis: find the stock lines that matter
How to rank your range by value so effort goes where the money is.
Reorder points and safety stock in plain English
Two numbers that stop both stockouts and overbuying.
LCL or FCL? Finding your break-even volume
When a full container becomes cheaper than paying by the cubic metre.
Get new guides by email
An occasional email when a new guide is published.
Most stock problems are not spread evenly across a range. A small number of lines usually carry most of the value, and a long tail carries very little. ABC analysis is the simplest way to see that split, and it only needs a spreadsheet.
What it is
You rank every line by its annual usage value, which is the number of units used or sold in a year multiplied by the unit cost. Then you group the lines into three classes:
- A lines make up roughly the first 80% of total annual usage value. They are often only around a fifth of your lines.
- B lines make up roughly the next 15%.
- C lines make up the final 5%, and are often half or more of the lines you stock.
The percentages are conventions, not rules. What matters is that the classes separate the lines that deserve close attention from those that do not.
How to do it
- Export every stock line with its unit cost and 12 months of usage or sales.
- Multiply the two to get annual usage value for each line.
- Sort from highest to lowest.
- Add a running total and express it as a percentage of the grand total.
- Mark lines A until the running total reaches about 80%, B to about 95%, and C for the rest.
What to do with the result
Review A lines often and set their reorder points carefully, because a mistake here is expensive in either direction. Manage B lines with standard rules. Keep C lines simple: fewer, larger orders are usually fine, and lines with no movement at all are candidates to run down or remove.
An ABC ranking is the first step in our inventory and material flow diagnostic.
If you reorder by feel, you will sometimes buy too early and tie up cash, and sometimes buy too late and run out. A reorder point replaces the feeling with a number: the stock level at which you place the next order.
The reorder point
The first part covers what you expect to use while you wait for the delivery. Safety stock covers the times when usage runs higher than average or the delivery arrives late.
A simple way to set safety stock
One common method compares your worst realistic case with your average case:
A worked example
These figures are invented for illustration. A line uses 20 units a day on average and 26 on its busiest days. The supplier normally takes 10 days and has taken as long as 12.
- Safety stock = (26 × 12) − (20 × 10) = 312 − 200 = 112 units
- Reorder point = (20 × 10) + 112 = 312 units
When stock on hand plus stock on order falls to 312 units, it is time to order.
Things to watch
- Use recent data. Usage and lead times from several years ago will give you the wrong answer.
- This method is cautious. For low-value lines it is fine; for expensive lines, a statistical method usually lets you hold less.
- Review the numbers when a supplier changes or demand shifts.
We calculate reorder points and safety stock for every line in our inventory and material flow diagnostic.
When you import by sea you can share a container with other shippers (less than container load, or LCL) or book a whole one (full container load, or FCL). LCL is priced by volume, so the cost rises with every cubic metre. FCL is a flat price for the container, however full it is. Somewhere between the two there is a volume at which the full container becomes cheaper.
The break-even
Above that volume, book the container. Below it, LCL is normally cheaper.
A worked example
These rates are invented for illustration. Suppose a 20ft container on your lane costs £1,800 all-in, and LCL on the same lane costs £120 per cubic metre all-in.
- Break-even = £1,800 ÷ £120 = 15 CBM
A 20ft container typically takes around 25 to 28 CBM of cargo in practice, so on these rates a 16 CBM shipment is cheaper in its own container even though the container travels well under full.
Compare like with like
- Use all-in costs for both options. LCL quotes often carry extra handling charges at origin and destination, and minimum charges, that are not in the headline rate.
- LCL may be charged on weight instead of volume for dense cargo. Check which applies to your goods.
- FCL is usually handled less and can be quicker through the port, which matters for fragile or urgent goods.
- Rates move. Recalculate the break-even whenever you get new quotes.
We work out the break-even for each of your import lanes in our freight cost audit.
Home / Resources / Sample report
See exactly what you would get
This sample shows the format and depth of an inventory diagnostic.
It covers where the stock value sits, the top excess lines, what to reorder first, and the actions to take.
Sample Co is fictional. All figures are invented.
- Product lines analysed
- 40
- Total stock value
- £250,546
- Excess stock found
- £108,301
- Excess as share of stock
- 43%
- Lines below reorder point
- 16
- Lines with no demand in 12 months
- 3
Home / About
About Leverforge
An independent supply chain consultancy for growing businesses that do not have a supply chain team.
What we do
Leverforge runs fixed-price diagnostics for small UK manufacturers and distributors. We take the data you already have, find where cash is tied up in stock, suppliers and freight, and give you a clear, prioritised plan to release it.
Our approach comes from the shop floor. It is built on hands-on experience of keeping a high-volume production line supplied: releasing purchase orders, managing supplier deliveries and resolving shortages before they reach production. We bring the same discipline to businesses where nobody has the supply chain as their job.
Why fixed price
You should know what a piece of work costs and what you will receive before you commit. Every project is a defined diagnostic with a written report, a walkthrough call and a price agreed up front.
Background and tools
- Several years of hands-on supply chain and procurement experience
- Day-to-day experience in purchasing, MRP and supplier management
- Freight cost analysis, including LCL and FCL
- Tools: SAP, Excel, Power BI, Python, SQL, Apple Numbers
- Based in Yorkshire, working with clients across the UK
Talk to us
The first 30-minute review is free and there is no obligation.
Book a free 30-minute reviewHome / Contact
Book a free 30-minute review
Tell us a little about your business and what is bothering you about stock, suppliers or freight. There is no obligation.
When calls happen
Calls are available at lunchtime and after 5pm on weekdays. The work itself is done remotely from your data.
Where we work
Based in Yorkshire, working with clients across the UK.
Home / Privacy policy
Privacy policy
How Leverforge handles personal information collected through this website.
What we collect
If you use the contact form or email us, we receive the details you give us, such as your name, company, email address and message. If you subscribe to our emails, we hold your email address.
How we use it
We use contact details to reply to you and to arrange and deliver work you ask us for. We use subscriber email addresses only to send the emails you signed up for. You can unsubscribe at any time.
Cookies and browser storage
This site stores a small amount of information in your browser to remember your cookie choice, whether you dismissed the announcement bar, and your savings calculator inputs. That information stays on your device.
We do not currently run analytics or advertising cookies. If we add analytics in future, they will only load if you chose "Accept all" on the cookie banner.
Client data
Business data sent to us for a diagnostic is covered by the confidentiality agreement signed before the project starts.
Your rights
You can ask to see, correct or delete the personal information we hold about you by emailing [email protected]. You also have the right to complain to the Information Commissioner's Office.
Information on this site
The guides, sample report and savings calculator are general information. They are not advice about your business, and results from the calculator are estimates based on the figures you enter.
Prices
Prices shown are starting prices. The price for your project is confirmed in a written proposal before any work begins.
Engagements
Work we carry out for clients is governed by the proposal and confidentiality agreement for that project, not by these website terms.
Content
The content of this site belongs to Leverforge. You are welcome to share links to it.